Defect Management appears throughout Manual Testing interviews. At medium level, interviewers are typically checking that you have used it in practice: what you configured, what broke, and how you knew it worked. Work through these, then explain your answer out loud; the second part is what interviews actually test.
20 example questions
1. "Time between defect introduction/detection and closure" — in Defect, this describes which of the following?
- A. Reopened.
- B. Latent defect.
- C. Defect age.correct
- D. Triage.
Why: defect age: Time between defect introduction/detection and closure.
2. "State when a supposedly fixed defect still occurs on retest" — in Defect, this describes which of the following?
- A. Triage.
- B. Reopened.correct
- C. Regression defect.
- D. Duplicate.
Why: reopened: State when a supposedly fixed defect still occurs on retest.
3. "Critical defect blocking further testing or release" — in Defect, this describes which of the following?
- A. Duplicate.
- B. Triage.
- C. Showstopper.correct
- D. Reopened.
Why: showstopper: Critical defect blocking further testing or release.
4. "Existing defect not yet discovered or triggered" — in Defect, this describes which of the following?
- A. Reopened.
- B. Latent defect.correct
- C. Triage.
- D. Duplicate.
Why: latent defect: Existing defect not yet discovered or triggered.
5. "Review meeting deciding defect priority and ownership" — in Defect, this describes which of the following?
- A. Showstopper.
- B. Defect age.
- C. Latent defect.
- D. Triage.correct
Why: triage: Review meeting deciding defect priority and ownership.
6. Identify the accurate statement about Defect:
- A. Deferred means the defect was proven not to exist.
- B. A defect report should exclude the steps to reproduce for brevity.
- C. Defect density counts test cases per tester.
- D. A typo on the company homepage is typically low severity but high priority.correct
Why: Business visibility drives priority independent of technical impact.
7. "Defect already reported in another ticket" — in Defect, this describes which of the following?
- A. Triage.
- B. Defect age.
- C. Duplicate.correct
- D. Reopened.
Why: duplicate: Defect already reported in another ticket.
8. Which statement correctly describes Defect?
- A. The defect life cycle starts at the Closed state.
- B. Severity and priority are guaranteed to always be identical.
- C. Root cause analysis aims to assign personal blame rather than prevent recurrence.
- D. A deferred defect is acknowledged but postponed to a future release.correct
Why: Deferral is a business decision, not a denial the defect exists.
9. Which of the following statements about Defect is TRUE?
- A. Deferred means the defect was proven not to exist.
- B. The defect life cycle typically flows New → Assigned → Open → Fixed → Retest → Closed (or Reopened).correct
- C. A defect report should exclude the steps to reproduce for brevity.
- D. Severity and priority are guaranteed to always be identical.
Why: States track a defect from discovery to verified resolution.
10. Which Defect concept matches this description: "Review meeting deciding defect priority and ownership"?
- A. Duplicate.
- B. Latent defect.
- C. Regression defect.
- D. Triage.correct
Why: triage: Review meeting deciding defect priority and ownership.
11. In Defect, which of the following is described as: "State when a supposedly fixed defect still occurs on retest"?
- A. Regression defect.
- B. Triage.
- C. Reopened.correct
- D. Showstopper.
Why: reopened: State when a supposedly fixed defect still occurs on retest.
12. In Defect, which of the following is described as: "Time between defect introduction/detection and closure"?
- A. Defect age.correct
- B. Triage.
- C. Duplicate.
- D. Regression defect.
Why: defect age: Time between defect introduction/detection and closure.
13. Which Defect concept matches this description: "New defect introduced by a recent change to working code"?
- A. Latent defect.
- B. Triage.
- C. Reopened.
- D. Regression defect.correct
Why: regression defect: New defect introduced by a recent change to working code.
14. Which Defect concept matches this description: "Time between defect introduction/detection and closure"?
- A. Latent defect.
- B. Showstopper.
- C. Defect age.correct
- D. Reopened.
Why: defect age: Time between defect introduction/detection and closure.
15. Which Defect concept matches this description: "State when a supposedly fixed defect still occurs on retest"?
- A. Showstopper.
- B. Regression defect.
- C. Duplicate.
- D. Reopened.correct
Why: reopened: State when a supposedly fixed defect still occurs on retest.
16. In Defect, which of the following is described as: "Critical defect blocking further testing or release"?
- A. Duplicate.
- B. Regression defect.
- C. Showstopper.correct
- D. Latent defect.
Why: showstopper: Critical defect blocking further testing or release.
17. Which Defect concept matches this description: "Existing defect not yet discovered or triggered"?
- A. Showstopper.
- B. Regression defect.
- C. Reopened.
- D. Latent defect.correct
Why: latent defect: Existing defect not yet discovered or triggered.
18. Which Defect concept matches this description: "Critical defect blocking further testing or release"?
- A. Defect age.
- B. Showstopper.correct
- C. Reopened.
- D. Latent defect.
Why: showstopper: Critical defect blocking further testing or release.
19. In Defect, which of the following is described as: "Review meeting deciding defect priority and ownership"?
- A. Triage.correct
- B. Reopened.
- C. Latent defect.
- D. Duplicate.
Why: triage: Review meeting deciding defect priority and ownership.
20. In Defect, which of the following is described as: "New defect introduced by a recent change to working code"?
- A. Triage.
- B. Reopened.
- C. Showstopper.
- D. Regression defect.correct
Why: regression defect: New defect introduced by a recent change to working code.