Risk-Based Testing interview questions — Medium

197 medium-level Risk-Based Testing questions from our Manual Testing bank, each with the correct answer and an explanation of why it is correct.

What this covers

Risk-Based Testing appears throughout Manual Testing interviews. At medium level, interviewers are typically checking that you have used it in practice: what you configured, what broke, and how you knew it worked. Work through these, then explain your answer out loud; the second part is what interviews actually test.

Other levels:Hard (100)Easy (98)

20 example questions

  1. 1. "Consequence of failure on revenue, users, or reputation" — in Risk-Based, this describes which of the following?

    • A. Risk exposure.
    • B. Contingency.
    • C. Mitigation.
    • D. Business impact.correct

    Why: business impact: Consequence of failure on revenue, users, or reputation.

  2. 2. "Document tracking identified risks and owners" — in Risk-Based, this describes which of the following?

    • A. Risk register.correct
    • B. Contingency.
    • C. Risk exposure.
    • D. Mitigation.

    Why: risk register: Document tracking identified risks and owners.

  3. 3. "Risk arising from complexity or new technology" — in Risk-Based, this describes which of the following?

    • A. Risk exposure.
    • B. Business impact.
    • C. Technical risk.correct
    • D. Contingency.

    Why: technical risk: Risk arising from complexity or new technology.

  4. 4. "Prepared response if a risk materializes" — in Risk-Based, this describes which of the following?

    • A. Business impact.
    • B. Technical risk.
    • C. Mitigation.
    • D. Contingency.correct

    Why: contingency: Prepared response if a risk materializes.

  5. 5. "Combined measure of probability times impact" — in Risk-Based, this describes which of the following?

    • A. Business impact.
    • B. Technical risk.
    • C. Risk exposure.correct
    • D. Mitigation.

    Why: risk exposure: Combined measure of probability times impact.

  6. 6. "Action reducing a risk's likelihood or impact" — in Risk-Based, this describes which of the following?

    • A. Technical risk.
    • B. Mitigation.correct
    • C. Risk exposure.
    • D. Contingency.

    Why: mitigation: Action reducing a risk's likelihood or impact.

  7. 7. Identify the accurate statement about Risk-Based:

    • A. A risk matrix plots test case count against tester names.
    • B. Product risks concern the system failing; project risks concern delivery (schedule, resources).correct
    • C. Risk-based testing treats all features as exactly equally important.
    • D. Project risks describe the software crashing in production.

    Why: Both risk types shape the test plan differently.

  8. 8. Which statement correctly describes Risk-Based?

    • A. Risk-based testing treats all features as exactly equally important.
    • B. A risk matrix plots test case count against tester names.
    • C. Risk levels must never be updated once assigned.
    • D. Risk assessments should be revisited as the product and knowledge evolve.correct

    Why: Risk is not static; reprioritize with new information.

  9. 9. Which of the following statements about Risk-Based is TRUE?

    • A. Project risks describe the software crashing in production.
    • B. Risk-based testing treats all features as exactly equally important.
    • C. A risk matrix plots test case count against tester names.
    • D. Product risks concern the system failing; project risks concern delivery (schedule, resources).correct

    Why: Both risk types shape the test plan differently.

  10. 10. In Risk-Based, which of the following is described as: "Consequence of failure on revenue, users, or reputation"?

    • A. Risk exposure.
    • B. Contingency.
    • C. Business impact.correct
    • D. Risk register.

    Why: business impact: Consequence of failure on revenue, users, or reputation.

  11. 11. In Risk-Based, which of the following is described as: "Document tracking identified risks and owners"?

    • A. Business impact.
    • B. Mitigation.
    • C. Contingency.
    • D. Risk register.correct

    Why: risk register: Document tracking identified risks and owners.

  12. 12. Which Risk-Based concept matches this description: "Consequence of failure on revenue, users, or reputation"?

    • A. Business impact.correct
    • B. Technical risk.
    • C. Contingency.
    • D. Risk exposure.

    Why: business impact: Consequence of failure on revenue, users, or reputation.

  13. 13. Which Risk-Based concept matches this description: "Document tracking identified risks and owners"?

    • A. Technical risk.
    • B. Risk exposure.
    • C. Contingency.
    • D. Risk register.correct

    Why: risk register: Document tracking identified risks and owners.

  14. 14. In Risk-Based, which of the following is described as: "Risk arising from complexity or new technology"?

    • A. Technical risk.correct
    • B. Risk register.
    • C. Risk exposure.
    • D. Contingency.

    Why: technical risk: Risk arising from complexity or new technology.

  15. 15. In the context of Risk-Based, which of the following is a correct statement?

    • A. A risk matrix plots test case count against tester names.
    • B. Project risks describe the software crashing in production.
    • C. When time is cut, risk ranking decides which tests to drop last.correct
    • D. Risk-based testing treats all features as exactly equally important.

    Why: Risk order makes descoping a rational decision.

  16. 16. In Risk-Based, which of the following is described as: "Combined measure of probability times impact"?

    • A. Technical risk.
    • B. Risk exposure.correct
    • C. Risk register.
    • D. Contingency.

    Why: risk exposure: Combined measure of probability times impact.

  17. 17. In Risk-Based, which of the following is described as: "Prepared response if a risk materializes"?

    • A. Technical risk.
    • B. Risk exposure.
    • C. Mitigation.
    • D. Contingency.correct

    Why: contingency: Prepared response if a risk materializes.

  18. 18. Which Risk-Based concept matches this description: "Combined measure of probability times impact"?

    • A. Contingency.
    • B. Mitigation.
    • C. Business impact.
    • D. Risk exposure.correct

    Why: risk exposure: Combined measure of probability times impact.

  19. 19. Which Risk-Based concept matches this description: "Action reducing a risk's likelihood or impact"?

    • A. Risk exposure.
    • B. Contingency.
    • C. Technical risk.
    • D. Mitigation.correct

    Why: mitigation: Action reducing a risk's likelihood or impact.

  20. 20. In Risk-Based, which of the following is described as: "Action reducing a risk's likelihood or impact"?

    • A. Technical risk.
    • B. Contingency.
    • C. Mitigation.correct
    • D. Business impact.

    Why: mitigation: Action reducing a risk's likelihood or impact.

Related Manual Testing topics